In a written statement, Surge noted that its wholly owned Medusa Unit C 28-09 3AH was successfully drilled to a total measured depth of 24,592 feet (total vertical depth of 7,102 feet). Based on IHS and Drillinginfo databases, the well is the longest known lateral in the Permian, the company noted. Surge added that the well was drilled 100 percent in zone of the Wolfcamp A formation with a total lateral length of 17,935 feet, or 3.4 miles.